Terms of Reference
1. Objectives of the Assignment
The objective of this assignment is to develop a web-based M&E platform that will support the KUSP APA III in effectively managing project data and monitoring progress against set indicators. The platform will enhance the ability of stakeholders to capture real-time data, generate insights, and provide timely reporting at multiple administrative levels (national, county, municipal, etc.).
- Develop and deploy a web-based platform to manage, monitor, and evaluate program/project performance.
- Provide tools for data collection, management, analysis, and reporting across various stakeholders.
- Facilitate decision-making based on real-time project data.
2. Scope of Services
The selected consultant/firm will provide the following services:
2.1 System Design and Requirement Gathering
- Conduct stakeholder consultations to define the system's functional and non-functional requirements, based on the project's Results Framework.
- Define user roles and access levels (Admin, Editor, Viewer).
2.2 Platform Development
- Design and develop a responsive, web-based M&E platform accessible on both PC and mobile devices.
- Key features:
- Data Collection: Develop customizable forms for qualitative and quantitative data, with multiple input types (e.g., dropdowns, rating scales, multiple choice).
- User Access: Implement secure login with role-based access controls.
- Import/Export: Include import and export functionality (Excel, PDF, Word, etc.).
- Reporting and Dashboards: Design interactive dashboards for real-time data visualization, progress tracking, and report generation.
2.3 Data Management and Analysis
- Ensure the platform supports data aggregation, analysis, and reporting based on pre-defined metrics.
- Develop mechanisms for automated data validation and verification, including a maker/checker control system.
- Enable the creation of ad-hoc reports for performance assessment.
2.4 Knowledge Management
- Develop an integrated Knowledge Management module to store and manage project documents (e.g., user manuals, FAQs, training materials).
- Ensure easy access to these documents by users at various levels.
2.5 System Verification, Testing, and Deployment
- Conduct rigorous testing (user acceptance testing, system performance testing, security testing).
- Ensure the platform is fully operational and meets the requirements of all users.
- Deploy the platform in a live environment.
2.6 Training and Capacity Building
- Conduct training workshops for system administrators and users.
- Provide user manuals and system documentation.
- Ensure a knowledge transfer process to the [Implementing Agency] technical team.
3. Deliverables
The key deliverables for this assignment include:
- Prototype: A Minimum Viable Product (MVP) for initial user testing.
- Final M&E Platform: The fully functional web-based M&E platform.
- User Training: Training workshops for platform users.
Methodology
- Adopt design thinking methodology with user research for system design.
- Agile, iterative approach for platform development with regular feedback loops.
5. Duration of the Assignment
The assignment is expected to take place over 4 months, from [Start Date] to [End Date], including the following phases:
- Phase 1: Requirement Gathering and System Design (1 week)
- Phase 2: Platform Development (12 weeks)